Prince Turki Street, Khobar



In office towers, finishing is not judged by how the office looks on handover day, but by how it performs every day for years. On the 9th floor of Al Khuzama Tower on Prince Turki Street in Khobar, we took over the entire floor and delivered a complete turnkey fit-out in about two months, and we still look after it today with periodic maintenance.
Seeing beats any description. Watch the clips below, filmed inside the 9th floor, to judge the quality of the work yourself:
The client wanted the entire 9th floor turned into ready-to-use office space, offices, restrooms and everything in between, so the team could move in and start working right away. Since an office is a company’s face to its clients and staff, the key condition was premium materials and delivering everything exactly the way the client wanted it.
That is why the project was contracted as turnkey finishing: one party responsible for every trade, from the first-fix installations to the last light fitting, instead of leaving the client to coordinate several contractors.
Beautiful finishes on weak installations become a problem within months. We started with the electrical works for the lighting and power points an office needs, and the plumbing for the restrooms, testing the networks before closing walls and ceilings.
Wet areas were waterproofed before tiling. In a multi-storey tower, a leak on one floor reaches the ceiling of the floor below, so proper waterproofing protects both the client and the building.
Gypsum board ceilings and decor were built to the client’s vision. In offices, the suspended ceiling also conceals and organizes electrical and AC runs, positions the lighting precisely, and keeps services accessible for maintenance.
Office floors face constant daily traffic, so flooring was installed in premium materials chosen by the client, with accurate levels and joints for a flat surface that handles heavy use.
After ceilings and floors came putty, sanding and final paint coats, then restroom finishing and sanitary fixtures, and finally installing and adjusting all light fittings.
The floor was handed over successfully and the client was happy with the result. We still carry out periodic maintenance and follow up directly on any issue. A good contractor does not disappear after the final payment.
About two months from takeover to handover, including installations, waterproofing, gypsum, flooring, paints, restrooms and lighting.
Yes. On this project we still provide periodic maintenance, and maintenance contracts can be arranged for any project.
Yes, we fit out offices and administrative floors across Khobar, Dammam, Dhahran and the Eastern Province, fully or partially.
Have an office floor or commercial space that needs this level of finishing?
Contact us now to carry out your project with the same quality and professionalism
General contracting, finishing, renovation and decor in the Eastern Province and Madinah: from a free site visit and bill of quantities to handover under a formal contract.