Many owners of old houses in Dammam, Khobar and Qatif face a hard decision: should I renovate the house or sell it? And before any decision comes the most important question: How much does it cost to renovate an old house? The short answer is that a full renovation in the Eastern Province in 2026 costs roughly between SAR 400 and 850 per square meter including materials and labor, while a partial renovation (a bathroom, kitchen or repainting) starts from just a few thousand.

In this guide we break down the prices of each type of renovation, explain the factors that raise or lower the cost, and give you worked examples for an apartment and a villa, with a practical plan showing where to start. The figures are estimates from the Eastern Province market, and the final price is set after inspecting the house.

Types of Renovation and the Cost of Each

Not every renovation is the same. Before asking about price, decide which type of renovation your house needs:

Renovation typeWhat it includesApproximate cost
Cosmetic renovationPaints, changing accessories, simple repairsSAR 80 – 150 per meter
Partial renovationA specific bathroom, kitchen, facade or roomSAR 150 – 300 per meter
Full renovationPlumbing, electrical, floors, paints and insulation for the whole houseSAR 400 – 850 per meter
Structural renovationTreating dangerous cracks and steel rust and strengthening columnsDepending on the engineering inspection

Structural renovation can’t be priced per meter before inspection, because treating one corroded column is completely different from treating a whole ceiling.

Prices of the Most Requested Renovation Items in the Eastern Province

These are approximate prices for the most requested renovation items in Dammam and Khobar, including materials and labor:

ItemApproximate cost
Complete bathroom renovation (breaking out, plumbing, insulation, tiles and fixtures)SAR 4,000 – 9,000 per bathroom
Kitchen renovation (plumbing, electrical and tiles, without cabinets)SAR 4,000 – 12,000
Repainting interior wallsSAR 50 – 100 per meter
Treating cracks and fissuresSAR 100 – 200 per linear meter
Facade renovation (paint, profile texture or stone)SAR 60 – 600 per meter depending on the material
Foam roof insulationSAR 35 – 55 per meter
Ceiling renovation with waterproofing and thermal insulationSAR 200 – 400 per meter
Breaking out and rebuilding a wallSAR 200 – 500 per meter
Rewiring a whole housedepending on the number of points and the area

Bathroom Renovation Cost in Detail

The bathroom is the most renovated room in Eastern Province homes, because it is the main source of damp and leaks. This is an approximate breakdown of the cost of renovating an average bathroom of 4 to 6 square meters:

ItemApproximate cost
Breaking out and removing debris and the old bedding layerSAR 500 – 1,200
New plumbing runs with PPR heat pipesSAR 800 – 2,000
Waterproofing with a 48-hour flood test300 – 700 SAR
Floor and wall tiles with adhesive and groutSAR 1,200 – 3,000
Sanitary fixtures (toilet, washbasin, mixers)SAR 1,000 – 4,000
Green gypsum or aluminum strip ceiling with lightingSAR 400 – 1,000
Extractor fan and electrical points200 – 500 SAR

The items total roughly SAR 4,400 to 12,400, and most bathrooms in old houses fall between 4,000 and 9,000. Sanitary fixtures are the item that controls the final price more than any other. A wall-hung toilet with a concealed cistern and European mixers can raise the cost of a single bathroom to SAR 15,000 or more.

Facade Renovation: Comparing Materials

The facade is the first thing people see, and the part most damaged by salty humidity in the Eastern Province. This is a comparison of the most popular facade renovation options:

MaterialApproximate cost per square meterExpected lifespanSuitable for the Eastern Province?
Elastomeric exterior paint60 – 120 SAR5 – 8 yearsYes, if moisture-resistant
Textured finish (spray)70 – 160 SAR8 – 12 yearsYes, the most common option
Natural stone with mechanical fixing250 – 600 SARMore than 25 yearsExcellent; mechanical fixing is essential
Exterior wood alternative (WPC)200 – 450 SAR15 – 20 yearsYes, unaffected by humidity and sun
Aluminum cladding250 – 500 SARMore than 20 yearsYes, needs professional installation

In Khobar, Dhahran and Qatif we advise against fixing stone with cement mortar alone, because humidity weakens the bond over time and the stone may fall.

Worked Examples of Renovation Costs

Cost of renovating a 150 m apartment

An old apartment that needs two bathrooms and a kitchen replaced, full repainting and electrical repairs:

  • Two bathrooms: 2 × 6,000 = SAR 12,000
  • Kitchen: SAR 8,000
  • Painting 400 m of walls and ceilings × SAR 70 = SAR 28,000
  • General electrical and plumbing repairs: SAR 7,000
  • Approximate total: SAR 55,000

A small apartment that only needs paint and simple repairs may start from SAR 18,000 to 35,000.

Cost of renovating a 350 m old villa

A villa over 20 years old that needs a full renovation: complete replacement of plumbing and electrical, roof insulation, and renewing bathrooms, kitchen, floors, paints and facade:

  • Full interior renovation: 350 × 650 = SAR 227,500
  • Roof insulation 200 m × 45 = SAR 9,000
  • Facade renovation 250 m × 250 = SAR 62,500
  • 10% contingency = approximately SAR 30,000
  • Approximate total: SAR 329,000

Renovating a 300 to 450 m villa with architectural changes (moving walls or merging rooms) can reach SAR 350,000 or 450,000.

The Factors That Determine a House Renovation Cost

1. The age and condition of the house

A house more than 25 years old usually needs its old steel pipes replaced completely, along with wires that can no longer handle modern AC loads. This alone can add 15% to 25% to the budget.

2. Hidden problems

In the Eastern Province specifically, many old houses have what we call “concrete cancer”: steel rusting inside the ceilings because of humidity and salinity. It only shows after the plaster is removed, and treating it raises the cost. That is why we always insist on an engineering inspection before final pricing.

3. The finishing level after renovation

A renovation that ends with local porcelain and standard paints is very different from one that ends with marble and complex gypsum ceilings. Decide the finishing level you want before requesting quotations.

4. Living in the house during renovation

If you will live in the house during the work, the renovation will be done in stages with each work area isolated, which lengthens the time and raises the cost slightly. Moving out completely speeds up the work and lowers the cost.

5. Municipality permit

Structural renovation, facade changes and additions need a renovation permit through the Balady platform, with fees and time that must be accounted for. Paints and simple interior finishes don’t need a permit.

Renovate, or Demolish and Rebuild?

When is renovation the wrong decision? The general rule we follow:

  • If the renovation cost is less than 50% of the cost of building new: renovation is usually the better decision.
  • If it exceeds 60% to 70%: think seriously about demolishing and rebuilding, especially if the structure is damaged.
  • If the structure is sound: renovation is always cheaper, even if the renewal is comprehensive.

Shell construction alone in Saudi Arabia costs roughly SAR 550 to 950 per meter, plus finishing. So fully renovating a villa with a sound structure is much cheaper than demolishing it. For details on the cost of new finishing, read the guide villa finishing cost in Dammam.

Signs Your House Needs Urgent Renovation

Don’t wait for the problem to grow. These signs mean that delay will raise the cost:

  • Diagonal cracks or cracks wider than 2 mm, especially around doors and windows
  • Pieces of ceiling plaster falling or reinforcement steel showing
  • Damp patches and white salts at the bottom of walls
  • An unexplained rise in the water bill
  • Breakers that keep tripping or a burning smell
  • Paint peeling a few months after it was renewed

We explained each sign in detail in the article Signs That Your Home Needs Renovation. And if your main problem is damp, we have a complete guide on treating wall dampness for good.

A Smart Renovation Plan: Where to Start?

If your budget is limited, set priorities like this:

  1. Safety first: Structural cracks and dangerous electrics.
  2. Shutting off the water: Plumbing leaks and roof and bathroom insulation. Any cosmetic renovation before stopping the water is a waste of money.
  3. Infrastructure: Replacing old pipes and wires before any new tiles or paint.
  4. Bathrooms and kitchen: The most used and most affected by damp.
  5. Finishing touches: Floors, paints, gypsum and the facade.

This order ensures you won’t have to break anything new to fix an old problem.

Renovation Duration by Type

Type of workApproximate duration
Interior painting for an apartment1 – 2 weeks
Complete bathroom renovation1 – 2 weeks
Kitchen renovation (without making the cabinets)1 – 3 weeks
Foam roof insulation1 – 3 days
Facade renovation2 – 5 weeks
Full apartment renovation4 – 8 weeks
Full villa renovation2 – 5 months

The duration gets longer if structural problems appear after inspection, or if the house is occupied during the work.

Questions to Ask the Contractor Before Signing

Before signing with any renovation contractor, ask these questions and listen carefully to the answers:

  1. Will you inspect the structure and plumbing before final pricing? A contractor who refuses to inspect will surprise you later.
  2. How will you deal with hidden problems if they appear? There should be a pre-agreed price for possible items.
  3. Which materials will you use for insulation and plumbing, by name?
  4. Will you do a flood test for the bathrooms before tiling? If the answer is no, look for someone else.
  5. Who will get the renovation permit if you need one?
  6. What is the warranty period on each item, and is it written in the contract?
  7. Do you have photos or similar previous projects I can see?

How to Avoid Cost Surprises in Renovation

  • Ask for an engineering inspection before pricing: A contractor who gives you a final price over the phone without a site visit will add items later.
  • Ask for a detailed bill of quantities: every item with its quantity, price and material.
  • Agree on the price of extra items in advance: such as the price of treating a meter of corroded steel if it appears after inspection.
  • Set aside a 10% to 15% contingency: old houses always have surprises.
  • Write the warranty into the contract: the warranty period on insulation, plumbing and electrical works, in numbers.

The Renovation Service at General Contracting Est.

We offer home and villa renovation services in Dammam, Khobar, Dhahran, Qatif and all cities of the Eastern Province, with clear steps:

  1. A free site visit and inspection of the structure, plumbing, electrics and damp
  2. A report of the problems ranked by priority
  3. A bill of quantities and a detailed quotation
  4. A formal contract with specifications, warranty and schedule
  5. Execution under technical supervision with regular reports
  6. Handover after quality inspection and a flood test for the bathrooms

Frequently Asked Questions About House Renovation Costs

How much does full renovation cost per meter in Dammam?

It ranges roughly from SAR 400 to 850 per square meter including materials and labor, depending on the house’s condition and the finishing level required.

How much does it cost to renovate an old bathroom?

Roughly SAR 4,000 to 9,000 for a complete bathroom, including breaking out, replacing plumbing, waterproofing, tiles and sanitary fixtures.

Do I need a permit to renovate my house?

You need a renovation permit from the Balady platform for structural works, facade changes and additions. Paints and simple interior finishes don’t need a permit.

How long does it take to renovate an old villa?

A full renovation of a medium-sized villa usually takes 2 to 5 months, and a partial renovation of a bathroom or kitchen takes one to 3 weeks.

Is renovation cheaper than building new?

Yes, if the structure is sound, a full renovation is usually less than half the cost of demolishing and rebuilding.

Can I live in the house during the renovation?

It is possible in a partial renovation with the work area isolated. In a full renovation covering plumbing, electrical and floors, it is better to move out for the family’s safety and faster completion.

How much does it cost to renovate an old house facade?

It ranges roughly from SAR 60 to 600 per meter depending on the material: elastomeric paint and profile texture at the low end, and natural stone and cladding at the high end.

Does renovation raise the value of a house when selling?

Yes, a renovated house with new plumbing and electrics and good insulation sells faster and for a higher price, because the buyer knows they won’t have to pay extra after buying.

Get an Accurate Estimate for Renovating Your House

Every house has its own condition, and the only way to know the real cost is an inspection. Book a free site visit or message us on WhatsApp 0548908670, and we’ll send you a report of the problems and a detailed quotation.